Office Relocation Checklist for Growing Businesses
Outgrowing your current space is a good problem to have - but relocating an office brings a lot of moving pieces, and it's easy for something to fall through the cracks under a deadline. Whether you're doubling your headcount or just need more room to work, here's a timeline to help growing businesses plan a relocation without the last-minute scramble.
3-6 Months Before the Move
- Reassess your space needs. Factor in projected headcount growth, hybrid vs. in-office ratios, and whether you need more private offices, more open collaboration space, or both.
- Get a space plan in place. A professional layout early on prevents costly changes later, especially if you're combining existing furniture with new pieces.
- Set your furniture budget - and decide on new vs. used. Mixing new furniture for client-facing areas with used furniture for back-office space can meaningfully stretch a relocation budget.
- Start sourcing early for longer-lead items, like custom cubicle configurations or larger conference tables, so they're ready by move-in.
6-8 Weeks Before
- Finalize your furniture order. Confirm what's new, what's used, and what's being reused from your current space.
- Schedule delivery and installation around your move date - not after it. Coordinating this in advance avoids a gap between move-in and having a usable office.
- Decide what happens to existing furniture you won't be taking with you - resale, donation, or removal.
- Loop in IT early on network, cabling, and equipment needs for the new layout, since furniture placement often depends on it.
2-4 Weeks Before
- Get final sign-off on the floor plan before anything is delivered - changes are far easier now than after installation.
- Communicate the timeline to your team, including what to pack themselves versus what the moving and installation crews will handle.
- Inventory what's being relocated so nothing gets lost in transition, especially shared equipment and storage.
- Plan for reconfiguration if existing furniture needs to be adapted to fit the new space rather than replaced outright.
Moving Week
- Coordinate old-space furniture removal, donation, or recycling so the prior space is left in good condition.
- Confirm delivery and installation logistics for the new space - access, loading, elevator scheduling, and timing around any other move-day activity.
- Do a pre-move walkthrough of the finished space before employees arrive, catching any placement issues while they're still easy to fix.
After the Move
- Walk the space with your team and flag anything that needs adjusting - furniture placement, storage gaps, or layout tweaks.
- Gather employee feedback in the first few weeks; small changes now are easier than a full reconfiguration later.
- Plan ahead for the next stage of growth, so your next expansion is a reconfiguration rather than another full relocation.
A relocation is easiest when the furniture side is handled as one project instead of a dozen separate ones. Workplace Furniture manages sourcing, delivery, installation, and removal for growing businesses planning a move - request a quote to start planning yours, or talk to our design consultation team about your new space.